ABOUT THE PROJECT
This project consists of the construction of a new control station, installation of new pipe, and Highway 12 crossing to harden the mainline. The control station will be an above ground building that will be used to control the water flow from the mainline pipe into the Cresbard tank and surrounding area.
WHY THE PROJECT
The existing control valve vault has reached the end of its useful life and requires replacement.
Location:
Rural Ipswitch
Estimated Completion (or Timeline):
Funding:
Engineer:
Assistance from Banner Associates, Inc.
Contractor:
Construction to be self-performed by WEB construction crews