PROJECT DESCRIPTION
This project consists of the construction of about five miles of 6-inch PVC watermain downstream of the Glenham Booster Station.
WHY THE PROJECT
System Expansion | Timeworn – needs replaced
The customer water demands downstream of the Glenham Booster Station exceed the capacity of the watermains, and customer pressures suffer as a result. This project will reduce bottlenecks within the existing watermains to improve pressure and capacity.
Location:
Rural Glenham and Mobridge
Estimated Completion (or Timeline):
Funding:
Engineer:
Assistance from Banner Associates, Inc.
Contractor:
Construction to be self-performed by WEB construction crews