ABOUT THE PROJECT
The existing 2.5-million-gallon Main Storage Tanks are critical to the system’s operation. The concrete reservoir rehabilitation was completed in 2024. The steel reservoir rehabilitation will consist of surface preparation and application of high-performance coatings to help prevent corrosion of the steel. The rehabilitation will ensure the continued reliable operation of these tanks into the future.
WHY THE PROJECT
Critical to the system’s operation, the existing 2.5-million-gallon Main Storage Tanks require rehabilitation to ensure the continued reliable operation of these tanks into the future.
Location:
Rural Java
Estimated Completion (or Timeline):
Funding:
Engineer:
Contractor:
O&A Classic Coatings and Painting Corp.